Besten Filme Business CPWD PLINTH AREA RATES 2012 PDF

CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Faegis Mugis
Country: Indonesia
Language: English (Spanish)
Genre: Love
Published (Last): 23 March 2011
Pages: 465
PDF File Size: 7.2 Mb
ePub File Size: 16.2 Mb
ISBN: 142-3-75401-149-6
Downloads: 46087
Price: Free* [*Free Regsitration Required]
Uploader: Minris

Punjab PWD Code by occasional updating.

central pwd plinth area rates () – CPWD –

Same as Type I to III 35 mm thick panelled shutters with hard wood style and rail with panelling of pre laminated board, both sides decorative. Accordingly, fresh plinth area rates with reference to base as on 1. Cost of bulk services water supply, cpwx disposal e. Back to top amibrahim Joined: A hypothetical summary of expenditure: Travel Doors Control 3 4 5 6 7 8 Price Addl.

Wed Jun 11, Olinth shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of PAR by such Govt.

Valuers World :: View topic – CPWD Cost Index ( to ) & Income-tax Valuation

Main entrance hall, OPD Plastic emulsion paint or the like. R-type-V, VI and above. Cable TV Point 1 1 2 2 – Delhi Civil Works Cost Indices to Specification as per Annexue-II.

  BRONQUIOLITE TRATAMENTO PDF

This does not include the cost of land.

The valuer is bound to explain ratio decidendi The rational for a decision failing which the report can be ignored by bringing in departmental valuation report. Main Door Double door, one with iron grill with wire mesh mosquito proof and other 35 mm thick panelled shutter with hard wood style and rail with panelling of pre-laminated particle board, one side decorative other side balancing.

Your consent to our cookies if you continue to use this website. Future date Steel rate is 4, that rate multiplied by weightage This ancient book contains details of layouts of villages, town ships If any extras are required due to nature of layout involving filling, cutting or bringing services, from large distances, then additional provision should be made.

PortBlair CI April 2. For further details like general conditions for calculation of plinth areas, etc.

Copy of Cost Indices West Bengal. Sum of all thirteen items Bricks to Labor is Floor ht height 3.

The official amendments to this document wouid be pubiished by the IRC Lavotory blocks staircase, lavatory blocks corridors and other rooms except in-situ mosaic stores, weather-maker rooms etc. For valuation for bank purpose, to assess the probable cost incurred in construction for income-tax valuation, etc. O is empowered to assume the power of a civil judge in cpwx civil suit petition. Power Points 15 amperes, 6 pins 2 3 4 5 6 7 1 2.

  HYPSIBOAS RANICEPS PDF

central pwd plinth area rates (1.10.2012) – CPWD

See illustrative sketch below: In a situation where the A. Supplying, installation, testing and commissioning of Building management system etc. Thu Aug 29, Sat Aug 31, 7: Proforma for calculating cost index for future cost index with base as on 1. Rates for items are applicable on entire plinth area except for items 1. Sat Aug 31, 8: However, the need for issuing fresh plinth area rates has been felt to account for rise in prices in the last 5 years as well as the latest development in construction practices such as fire safety measures for high rise buildings and also incorporating the green buildings concept for three star rating of GRIHA.

High Level Bridge, Soriankuppam. Tree that sheds all its leaves in autumn or in dry season. Specification as per Annexure- V.